Exam Question
The Product Backlog is ordered by:
(choose the best answer)
A. The Product Owner with the most valuable items placed at the top.
B. Risk, where safer items are at the top, and riskier items are at the bottom.
C. Size, where small items are at the top and large items are at the bottom.
D. Items are randomly arranged.
Correct Answer
A. The Product Owner with the most valuable items placed at the top.
Explanation
Correct Answer
A. The Product Owner with the most valuable items placed at the top:
The Product Backlog is ordered by the Product Owner, who is responsible for maximizing the value of the product. The Product Owner orders the backlog so that the items that are expected to deliver the most value are placed at the top. This ensures that the Scrum Team is always working on the most important and valuable features or fixes first. The order reflects considerations such as customer needs, business value, market conditions, and feedback from stakeholders.
Why the Other Options Are Less Appropriate
B. Risk, where safer items are at the top, and riskier items are at the bottom:
While risk may influence the ordering of the Product Backlog, it is not the primary criterion. The Product Owner may consider risk when ordering the backlog, but the primary focus is on value.
C. Size, where small items are at the top and large items are at the bottom:
The size of an item does not determine its position in the Product Backlog. Items are ordered based on their value, not their size. Smaller items might be at the top if they are valuable, but size alone is not the deciding factor.
D. Items are randomly arranged:
The Product Backlog is never randomly arranged. It is a carefully ordered list, with the Product Owner continuously adjusting it to ensure that the Scrum Team works on the most valuable items first.
Relevance to the PSD Exam
Understanding how the Product Backlog is ordered is critical for the PSD exam. This knowledge ensures that you can effectively contribute to the Scrum Team by focusing on the most valuable work and understanding the rationale behind the Product Backlog order.
Key Takeaways
- The Product Backlog is ordered by the Product Owner, prioritizing items that deliver the most value.
- Risk, size, and other factors may influence the ordering, but value is the primary criterion.
- Properly ordering the Product Backlog ensures that the Scrum Team always works on the most important and valuable items.
Conclusion
The Product Backlog is a vital tool in Scrum, ordered by the Product Owner to maximize the value delivered by the Scrum Team. Understanding this helps ensure that the team is aligned and focused on what matters most. For more information on preparing for the PSD exam, visit our Professional Scrum Developer PSDâ„¢ Exam Prep.